Section 1
Section 2
A1A2_DC(BS)
B1B2_DC(BS)
BH_LINE
(WA1)A1
(WA2)B1
B2
A2
en04000503.vsd
BH_LINE
BH_LINE BH_LINE
IEC04000503 V1 EN-US
Figure 349:
Busbars divided by bus-section disconnectors (circuit breakers)
The project-specific logic is the same as for the logic for the double-breaker
configuration.
Signal
S1DC_OP
All disconnectors on bus-section 1 are open.
S2DC_OP
All disconnectors on bus-section 2 are open.
VPS1_DC
The switch status of disconnectors on bus-section 1 is valid.
VPS2_DC
The switch status of disconnectors on bus-section 2 is valid.
EXDU_BB
No transmission error from breaker and a half (BH) that contains the above
information.
15.4.7
Interlocking for busbar earthing switch BB_ES
IP14164-1 v4
15.4.7.1
Application
M15015-3 v7
The interlocking for busbar earthing switch (BB_ES) function is used for one
busbar earthing switch on any busbar parts according to figure
QC
en04000504.vsd
IEC04000504 V1 EN-US
Figure 350:
Switchyard layout BB_ES
M15053-4 v4
The signals from other bays connected to the module BB_ES are described below.
15.4.7.2
Signals in single breaker arrangement
M15053-6 v5
The busbar earthing switch is only allowed to operate if all disconnectors of the
bus-section are open.
Section 15
1MRK 506 369-UEN B
Control
682
Line distance protection REL670 2.2 IEC
Application manual
Summary of Contents for REL670 2.2 IEC
Page 1: ...RELION 670 SERIES Line distance protection REL670 Version 2 2 IEC Application manual ...
Page 2: ......
Page 32: ...26 ...
Page 70: ...64 ...
Page 110: ...104 ...
Page 152: ...146 ...
Page 564: ...558 ...
Page 570: ...564 ...
Page 592: ...586 ...
Page 706: ...700 ...
Page 804: ...798 ...
Page 848: ...842 ...
Page 860: ...854 ...
Page 882: ...876 ...
Page 896: ...890 ...
Page 906: ...900 ...
Page 907: ...901 ...