7 - Operation
S
pecifications on the operation of the LEDs
In correspondence to each status of the inverter indicated by the constant
or intermittent lighting of the specific LED, the
display
05
also shows
a message identifying the operation which is being carried out or the
defect/
anomaly recorded (see specific chapter).
In the case of malfunction it is extremely dangerous to intervene personally to try and elimi-
nate the defect. The instructions below must be followed scrupulously; if you do not have the
necessary experience and training to intervene safely, please contact a specialist.
L
ED insulation fault
Interventions after warning of insulation fault
When the red LED comes on, first try to reset the warning by pressing the
multi-function ESC button on the keyboard
06
.
If the inverter reconnect normally to the network, the fault was due to
temporary phenomena.
You are advised to have the plant inspected by the installer or a specialist if this malfunction
occur repeatedly.
If the inverter doesn’t reconnect to the grid, isolate it on both the AC and
DC sides (by using the disconnect switches), then contact the installer or
authorised centre to repair the fault in the photovoltaic generator.