Operation Manual / Power2 845-M / High-pressure stage
3 Removal and installation / 3.3 Installing the high-pressure stage
© Copyright 2022 ABB. All rights reserved.
HZTL4069_EN
Rev.F
March 2022
3.3
Installing the high-pressure stage
CAUTION
Tilting of high-pressure stage and leaks at the bellows
The high-pressure stage may not be transported or put down with the air
suction branch and the bellows fitted.
u
The air suction branch / bellows combination must be transported and
fitted separately.
Fig. 13: Suspension of complete high-pressure stage
u
Attach one lifting gear to the two suspension points of the bearing casing and one lifting
gear to the support.
u
Check that the orifices specified for the high-pressure stage are installed in the two oil
supply pipes.
u
Check that the gaskets have been correctly fitted at the oil inlet and the oil outlet in the
bracket.
u
Check that the sleeves of the bearing casing fixing screws have been correctly fitted.
u
Align the high-pressure stage on the engine.
u
Tighten fixing elements at the foot and support in accordance with the enginebuilder's in-
structions.
u
Connect the cable connector to the speed sensor.
u
Install the air suction branch together with the bellows
(see Fig. 41: Installing the air suc-
u
Attach all gas, air, water and oil pipes in accordance with the enginebuilder's instructions.
u
Fit insulation.
Page
32
/
104
Summary of Contents for PT004161
Page 2: ......