![ABB PT004149 Operation Manual Download Page 44](http://html2.mh-extra.com/html/abb/pt004149/pt004149_operation-manual_5245577044.webp)
Operation Manual / Power2 850-M / High-pressure stage
5 Monitoring during operation / 5.3 Speed measurement
© Copyright 2022 ABB. All rights reserved.
HZTL4063_EN
Rev.F
March 2022
5.3.5
Replacing the speed measurement system
Removing the speed measurement system
Fig. 16: Dimension X
u
Measure and note down dimension X.
Fig. 17: Removing the speed measurement system
Page
42
/
104
Summary of Contents for PT004149
Page 2: ......