Assembly Instructions / Power2 500-M
4 Installing the low-pressure stage / 4.2 Steps for fastening the low-
pressure stage
© Copyright 2020 ABB. All rights reserved.
HZTL455311P0009_EN
Rev.A
July 2020
Step 4:
Fig. 8: Pre-tightening torque sequence 2
u
Tighten the TE foot screws (1, 2, 7, 8) with the pre-tightening torque.
Power2
Gas outlet branch position
Sequence
550 LP
NB000 (045 / 315)
1, 2, 7, 8
NB090
1, 8, 7
NB270
2, 7, 8
Table 11: Pre-tightening torque sequence
Power2
Thread size [mm]
Pre-tightening torque [Nm]
550 LP
M24
160
Table 12: Pre-tightening torque
Page
17
/
29
Summary of Contents for Power2 Series
Page 2: ......