
Assembly Instructions / Power2 850-M
5 Installing the high-pressure stage /
© Copyright 2019 ABB. All rights reserved.
HZTL455311P0010_EN
Revision A
March 2019
5
Installing the high-pressure stage
Fixing elements and installation force
The fixing screws and sleeves for fastening the high-pressure stage are not included in the
ABB Turbo Systems scope of delivery and must be designed by the enginebuilder in accord-
ance with the following details.
Bearing casing
Support
Fig. 6: Fixing elements
Subject
Requirements
Fixing elements
Plug bolt or screw with washer
Washers under the screw head
or nut
Use hardened washers,
thickness
≥
15% of the nominal thread diameter
Sleeves
Strength class 10.9 (DIN EN ISO 898-1)
Table 10: Fixing elements
The required installation pre-tension force for the fixing elements of the turbocharger are
defined in table
(see Table 11: Fixing element requirements
. An appropriate tighten-
ing method must be chosen for assembly. For the case of the torque-controlled tightening
method, an appropriate tightening torque is defined in table
Power2
Subject
Requirements
Bearing casing
Requirements
Support profile
850 HP
Thread size
M20
M20
Quantity
2
3
High-pressure stage clamping length a
50 mm
30 mm
Minimum screw-in depth E
min
30 mm
30 mm
Bracket clearance depth D
20 mm
40 mm
Bracket clearance diameter G
30 +0.02 -0 mm
22 mm
Installation pre-tensioning force F
M
190 kN
190 kN
Sleeve outside diameter d
a,H
30 +0.021 +0.008 mm
Chamfering 0.5x45°
--
Sleeve inside diameter d
i,H
22 mm
--
Sleeve length l
H
35 mm
--
Tightening torque M
A
(in accordance with VDI 2230, M20, 10.9,
μ
G
=0.12)
600 Nm
600 Nm
Table 11: Fixing element requirements
Page
14
/
21
Summary of Contents for Power2 800-M
Page 2: ......