
WARNING
Check to ensure that a proper bond is installed between
neutral and ground at the transformer upstream from all
3-phase wye, 3-phase high-leg or 2-phase SPD devices. If
the transformer is not accessible, check the main service
disconnect/panel for the NG bond. Lack of a proper bond may
damage the SPD and void the warranty. Failure to provide this
bond, as required per article 250.30 of the National Electrical
Code, can result in elevated phase-to-ground source voltage
potentials. These voltages can cause damage to electrical
equipment as well as safety hazards including fire, electrical
shock, serious injury or death.
Vérifiez qu’une liaison correcte est installée entre le neutre et
la terre au niveau du transformateur en amont de tous les SPD
triphasés en étoile, triphasés en triangle ou biphasés. Si le
transformateur n’est pas accessible, vérifiez la liaison NG sur
le sectionneur / panneau de service principal. L’absence d’une
liaison appropriée peut endommager le SPD et annuler la
garantie. L’absence de cette liaison, telle que requise par
l’article 250.30 du Code national de l’électricité, peut entraîner
des potentiels de tension élevés entre la phase et la terre. Ces
tensions peuvent causer des dégâts aux équipements
électriques ainsi que des risques en matière de sécurité,
notamment des incendies, des chocs électriques, des
blessures graves ou la mort.
WARNING
Installation by persons with electrotechnical
expertise only.
WARNUNG!
lnstallation nur durch elektrotechnische Fachkraft.
AVERTISSEMENT!
lnstallation uniquement par des personned qualifiées
électrotechnique.
IADVERTENCIA!
La instalación deberá ser realizada únicamente
por electricistas especializados.
3
G U I D E TO I N S TA L L AT I O N A N D A SS I S TA N C E