ABB OVR TN Series Installation Instructions Download Page 2

Notes

Data

Power

Distribution

Unit

Power Line

SPD

ELECTRONIC SYSTEMS PROTECTION

Plug-in Lightning Barrier

Wilford Road,
Nottingham,
NG2 1EB, UK

Earth

Equipment

Figure 4:  
Connection to the equipment earth star point.

Contact us

ABB Ltd
Tower Court 
Foleshill Enterprise Park 
Courtaulds Way 
Coventry CV6 5NX
Tel:  

0333 999 9900

Fax:  

0333 999 9901

E-Mail:  

[email protected] 

Twitter: @ABBUKLVP

www.abb.co.uk/lowvoltage

© Copyright 2018 ABB. All rights reserved. 
Specifications subject to change without notice.

  © 

C

op

yr

igh

t ABB. 0

3/2018  9AKK1

06

713A8

724

— 

INST

ALLA

TION INSTRUCTIONS

for plug-in t

elephone 

SPDs

OVR TN & ISDN Ser

ies

Environment
Consider the protection of the environment!  
Used electrical and electronic equipment  
must NOT be disposed of with domestic waste. The 
device contains valuable raw materials which can be 
recycled. Therefore, contact ABB for disposal of this 
equipment.

Reviews: