3.9 Initial test before commissioning
Protective earth
Before supplying power to the robot and commissioning, verify that the cabinet is
connected to protective earth according to
protective earth to the controller on page 77
Function tests
Before commissioning, perform the function tests in section
to verify that the safety features work properly.
Product manual - OmniCore V250XT
153
3HAC073447-001 Revision: B
© Copyright 2020-2022 ABB. All rights reserved.
3 Installation and commissioning
3.9 Initial test before commissioning
Summary of Contents for OmniCore V250XT
Page 1: ...ROBOTICS Product manual OmniCore V250XT ...
Page 34: ...This page is intentionally left blank ...
Page 50: ...This page is intentionally left blank ...
Page 174: ...This page is intentionally left blank ...
Page 410: ...This page is intentionally left blank ...
Page 418: ...This page is intentionally left blank ...
Page 454: ......
Page 455: ......