QUICK START GUIDE 

Information: Rectifier Status LEDs

 

Specifications and Application

 

Specifications and ordering information are in the Infinity S Ordering Guide available at 

abbpowerconversion.com

 

External Surge Protective Device (SPD) is required on all AC inputs. 
Equipment and subassembly ports:   

1. are suitable for connection to intra-building or unexposed wiring or cabling; 

2. can be connected to shielded intra-building cabling grounded at both ends. 

Grounding  /  Bonding  Network  –  Connect  to  an  Isolated  Ground  Plane  (Isolated  Bonding  Network)  or  an 

Integrated Ground Plane (Mesh-Bonding Network or Common Bonding Network). 
Installation Environment - Install in Network Telecommunication Facilities, OSP, or where NEC applies. 
Battery return may be either Isolated DC return (DC-I) or Common DC return (DC-C). 

 

Reference Documents 

These documents are available at 

abbpowerconversion.com

 

Document 

       Title 

CC848815341 

  Galaxy Pulsar Plus Product Manual 

Infinity S Ordering Guide (aka product line brochure) 

 

Safety Statements

 

 

Do not install this equipment over combustible surfaces.  

 

Rules and Regulations - Follow all national and local rules and regulations when making field connections.  

 

Compression Connectors 

 

U. S. or Canada installations - use Listed/Certified compression connectors to terminate Listed/Certified 

field-wire conductors. 

 

All  installations  -  apply  the  appropriate  connector  to  the  correct  size  conductor  as  specified  by  the 

connector manufacturer, using only the connector manufacturer’s recommended or approved tooling for 

that connector.  

 

Electrical Connection Securing:  Torque to the values specified on labels or in the product documentation.  

 

Cable Dress - dress to avoid damage to the conductors and undue stress on the connectors.  

 

Circuit Breakers and Fuses 

 

Use only those specified in the equipment ordering guide. 

 

Size as required by the National Electric Code (NEC) and/or local codes. 

Safety Tested Limits - Refer to the equipment ratings to assure current does not exceed: 

 

Continuous Load (List 1) - 60% of protector rating 

 

Maximum Load (List 2 - typically end of discharge) - 80% of protector rating. 

 

GMT Style Fuses - Use only fuses provided with safety caps. 

 

Field-wired Conductors - Follow all National Electric Code (NEC) and local rules and regulations. 

 

Insulation rating:  90°C minimum; 105°C (minimum) if internal to enclosed equipment cabinets. 

 

Size AC field-wired conductors with 75°C ampacity (NEC) equal to or greater than their panel board circuit 

breaker rating. 

Summary of Contents for NES48-23-AC1-PS4-DC1E-LVBD

Page 1: ...ew Drivers Screw Drivers 1 Flat 2 Phillips Wire cutters and strippers Read and follow all safety statements and precautions in this guide NES48 23 AC1 PS4 DC1E LVBD 19 23 wide AC input AC1 Molex AC2 IEC 3 20 C 19 AC5H Term Block AC6 3 phase delta Term Block 19 only AC7 3 phase delta wye Term Block 19 only of Power Slots of Distribution Panels LVBD option Step 1 Mount the System Mount the system wi...

Page 2: ... 23 AWG max Strip Wire mm Torque In lb Nm AC1 Molex mini fit SR 2 Yes 8 n a AC3 IEC 320 C19 1 Yes Yes 12 n a AC5 Terminal Block 1 Yes Yes 10 10 7 0 75 AC6 Terminal Block 3 phase Delta 3 Yes 6 12 16 1 75 AC7 Terminal Block 3 phase Wye 3 Yes 6 12 16 1 75 Information Rectifier Options Rectifier Input DC Output Recommended AC Breaker 3 phase Volts amps AC1 2 rects per feed AC3 AC5 AC6 AC7 NE050ECO48AT...

Page 3: ...ion is selectable between battery input or load output Breaker sizes up to 250A TPS fuses to 70A and GMT fuses to 12A are available Lug Landings Distribution Battery Bus Landings 1 4 20 studs on 5 8 centers Lug tongue width 0 68 max 5 16 18 studs on 1 centers Torque 65 in lb 7 16 socket 160 in lb 1 2 socket Two multi pole adapters are required for each multi pole breaker see illustration right Mul...

Page 4: ...il the faceplate releases and swings outward 3 Slide the rectifier into the slot until it engages with the back of the shelf Swing the faceplate closed to fully seat the rectifier Verify the faceplate is latched 4 Correct insertion of the rectifier will automatically add the unit to the controllers inventory of units Step 6 Set Controller Jumpers Connect per site engineering instructions Pulsar Pl...

Page 5: ...ve High Voltage Shutdown 50 to 60V 58 50 58 50 58 50 High Float Voltage Major Alarm 50 to 60V 57 00 57 00 57 00 High Float Voltage Minor Alarm 50 to 60V 56 00 56 00 56 00 Rectifier System Float Voltage 42 to 56 5V 54 48 52 08 54 40 Battery on Discharge Float Alarm 46 to 55V 51 00 50 00 51 00 Very Low Float Voltage Alarm 40 to 51V 46 00 46 00 46 00 Rectifier On Threshold 40 to 51V 44 00 44 00 44 00...

Page 6: ...put Defaults Pin Color Option 1 Color Option 2 PCR Power Critical 1 BL BL PCR_C Power Critical_C 11 W BL BK PMJ Power Major 2 O O PMJ_C Power Major_C 12 W O BK PMN Power Minor 3 G G PMN_C Power Minor_C 13 W G BK R1 Battery On Discharge 4 BR W R1_C Battery On Discharge_C BD_C 14 W W BK R2 Very Low Voltage VLV 5 S BK R2_C Very Low Voltage_C VLV_C 15 W BK W R3 Fuse Alarm Major FAJ 6 BL BL W R3_C Fuse...

Page 7: ...n Normal Amber Minor Alarm Red Critical Major Alarm Some alarms may occur during initial installation eg thermal probe fail or Major Minor communication fail Clear these alarms Via Controller Display follow the menu path Menu Control Operation Clear Events or Uninstall Equipment Verify Basic Installation Settings Date Time Battery Type number of strings and float voltage Menu Configuration System ...

Page 8: ... a standard ethernet cable Use a standard web browser to access the controller web pages at default IP address 192 168 2 1 Warning Do not connect LAN port to a network when set to Server mode Set the controller LAN port to Client or Static before connecting to the network Static is the factory default setting and the typical setting for most networks Once connected to the controller web server a l...

Page 9: ...l and local rules and regulations when making field connections Compression Connectors U S or Canada installations use Listed Certified compression connectors to terminate Listed Certified field wire conductors All installations apply the appropriate connector to the correct size conductor as specified by the connector manufacturer using only the connector manufacturer s recommended or approved to...

Page 10: ...are and follow all safety warnings and practices when servicing this equipment Hazardous energy and voltages are present in the unit and on the interface cables that can shock or cause serious injury When equipped with ringer modules hazardous voltages will be present on the ringer output connectors Use the following precautions in addition to proper job training and safety procedures Use only pro...

Page 11: ...reserved QUICK START GUIDE Version Date Description of the change 9 0 04 07 2021 Updated as per template and added new pictures 10 0 05 26 2022 Corrected labeling in figure on page 1 Change History excludes grammar clarifications ...

Page 12: ... reproduction disclosure to third parties or utilization of its contents in whole or in parts is forbidden without prior written consent of ABB Copyright 2020 ABB All rights reserved We reserve the right to make technical changes or modify the contents of this document without prior notice With regard to purchase orders the agreed particulars shall prevail ABB does not accept any responsibility wh...

Reviews: