Indoor/ Outdoor Installation
G
ENERAL
Metal-enclosed switchgear ships in sections. Sections up to 96
inches ship on heavy timber bases or on optional throw away steel
bases
Unload the switchgear as close to the installation site as possible.
Raise the switchgear with jacks and move on rollers with the shipping
bases in place or with an overhead hoist and spreader bar. See pages
15 and 16.
M
OVING BY
J
ACKS AND
R
OLLERS
Use of forklift trucks for jacking or placing the jacks other than as
described may result in stress distortions and irreparable damage
to the switchgear.
Do not remove the shipping bases until the units are set in place.
Moving the units without the shipping base will cause irreparable
damage and a hazardous condition.
Chapter
5
Summary of Contents for K-Line Plus
Page 2: ......
Page 4: ......
Page 5: ......
Page 7: ......
Page 9: ...K L i n e P l u s 2 ...
Page 15: ...K L i n e P l u s 8 ...
Page 30: ...K L i n e P l u s 23 Torque the inch bus hardware to 30 45 foot pounds ...
Page 36: ......
Page 37: ...K L i n e P l u s 30 Figure 20 Lifting eyes with anchor plates Lifting eye Anchor Plate ...
Page 39: ...K L i n e P l u s 32 ...
Page 47: ...K L i n e P l u s 40 ...
Page 53: ...K L i n e P l u s 46 ...
Page 61: ...K L I N E P L U S ...
Page 64: ...K L I N E P L U S ...