Note
Action
Guide pin, M16x150: 3HAC13120-2
Fit two guide pins in opposite M16 holes
in the axis-3 gearbox.
Tip
Lubricate the guide pins with some grease
to make the upper arm slide better.
3
Guide pin, M16x200: 3HAC13120-3
Always use guide pins in pairs.
xx1700000056
Securing the upper arm
Note
Action
CAUTION
The weight of the complete upper arm (in-
cluding the wrist) is 465 kg
All lifting accessories used must be sized
accordingly.
1
See
Attaching lifting accessories to the
Attach the lifting accessories, if not already
fitted.
2
Lift the upper arm and bring it towards the
lower arm.
3
24 VDC power supply
If the axis-3 motor is installed to the upper
arm:
4
Rotation tool
Connect the 24 VDC power supply, to re-
lease the brakes.
Connect to R2.MP3-connector:
•
+ = pin 2
•
- = pin 5
Use the rotation tool and rotate the axis-3
motor to find the correct position for the
guide pins in the lower arm.
Disconnect and remove the 24 VDC power
supply after finding the position.
Pinion: 3HAC067545-001
If the axis-3 motor is not installed to the
upper arm:
5
Use the pinion to rotate the axis-3 gearbox
to find the correct position for the guide
pins in the lower arm.
Continues on next page
292
Product manual - IRB 6700Inv
3HAC058254-001 Revision: L
© Copyright 2017 - 2020 ABB. All rights reserved.
4 Repair
4.5.1 Replacing the upper arm
Continued
Summary of Contents for IRB 6700I
Page 1: ...ROBOTICS Product manual IRB 6700Inv ...
Page 16: ...This page is intentionally left blank ...
Page 40: ...This page is intentionally left blank ...
Page 182: ...This page is intentionally left blank ...
Page 672: ...This page is intentionally left blank ...
Page 704: ...This page is intentionally left blank ...
Page 720: ...This page is intentionally left blank ...
Page 722: ...This page is intentionally left blank ...
Page 729: ......