Note
Action
Turn the upper arm in such a position that
the gear mating surface faces upwards.
2
For art. no. see:
•
Required equipment on page 420
Fit two
guide pins
in 180° relation to each
other in the holes of the upper arm, used
for the attachment screws of the gearbox
3
CAUTION
The gearbox weighs 60 kg! All lifting equip-
ment used must be sized accordingly!
4
Lift the gearbox to its mounting position.
5
Turn the gearbox to align the holes of the
attachment screws of the gearbox with
those in the upper arm.
6
Place the gearbox on the guide pins and
slide it carefully into position.
7
Make sure that:
•
the
o-rings
are seated correctly
•
the gearbox is correctly oriented.
8
Remove the lifting tool.
9
M12x60
Secure the gearbox with 22 of the 24 attach-
ment screws.
10
Tightening torque: 115 Nm
Note
Use new attachment screws and washers!
Refitting the upper arm
Use this procedure to refit the upper arm.
Note
Action
xx1000000439
Fill the
hole for the slotted spring pin
with
Sikaflex 521FC.
1
Part:
•
A: Hole for slotted spring pin
Continues on next page
428
Product manual - IRB 6640 Foundry Prime
3HAC040586-001 Revision: N
© Copyright 2011-2018 ABB. All rights reserved.
4 Repair
4.7.3 Replacing gearbox axis 3
Continued
Summary of Contents for IRB 6640 Foundry Prime
Page 1: ...ROBOTICS Product manual IRB 6640 Foundry Prime ...
Page 18: ...This page is intentionally left blank ...
Page 118: ...This page is intentionally left blank ...
Page 438: ...This page is intentionally left blank ...
Page 448: ...This page is intentionally left blank ...
Page 456: ...This page is intentionally left blank ...
Page 486: ...This page is intentionally left blank ...
Page 488: ...This page is intentionally left blank ...
Page 495: ......