4 Repair
4.2.1. Performing a leak-down test
3HAC022031-001 Revision: C
76
©
Co
py
rig
h
t 200
4-
200
8 ABB. All righ
ts reser
v
ed.
4.2 General procedures
4.2.1. Performing a leak-down test
General
After refitting any motor and gearbox, the integrity of all seals enclosing the gearbox oil must
be tested. This is done in a leak-down test.
Required equipment
Procedure
Equipment, etc.
Art. no.
Note
Leakdown tester
3HAC0207-1
Leak detection spray
-
Action
Note
1. Finish the refitting procedure of the motor or gear in
question.
2. Remove the topmost oil plug on the gear in question,
and replace it with the
leakdown tester
.
Adapters may be required, which are included in the
leakdown tester kit.
Art. no. is specified in
3. Apply compressed air, and raise the pressure with the
knob until the correct value is shown on the
manometer.
Recommended value:
0.2 - 0.25 bar (20 - 25 kPa)
4. Disconnect the compressed air supply.
5. Wait for approx. 8-10 minutes. No pressure loss must
be detected.
If the compressed air is
significantly colder or warmer
than the gearbox to be tested, a
slight pressure increase or
decrease respectively may occur.
This is quite normal.
6. Was any pressure drop evident?
Localize the leak as detailed below.
Remove the leakdown tester, and refit the oil plug.
The test is complete.
7. Spray suspected leak areas with
leak detection spray
.
Bubbles indicate a leak.
8. When the leak has been localized: take the necessary
measures to correct the leak.
Summary of Contents for IRB 2400/10
Page 1: ...Product manual Articulated robot IRB 2400 L IRB 2400 10 IRB 2400 16 M2000 M2000A M2004 ...
Page 2: ......
Page 8: ...Table of Contents 6 3HAC022031 001 Revision C Copyright 2004 2008 ABB All rights reserved ...
Page 191: ......
Page 192: ......
Page 193: ......
Page 194: ......
Page 195: ......
Page 198: ......
Page 199: ......
Page 202: ......
Page 203: ......
Page 205: ......
Page 226: ......