![ABB Industrial enabled Analyzer 9437 Instruction Manual Download Page 6](http://html.mh-extra.com/html/abb/industrial-enabled-analyzer-9437/industrial-enabled-analyzer-9437_instruction-manual_4583006.webp)
4
…2
MECHANICAL INSTALLATION
2.2
Mounting the Instrument
2.2.1
Wall-mounted Instrument – Figs. 2.2, 2.3 and 2.4
2.2.2
Panel-mounted Instrument – Figs. 2.5 and 2.6
Fig. 2.2 Overall Dimensions
Fig. 2.3 Wall Mounting
Fig. 2.4 Pipe Mounting
Fig. 2.5 Overall Dimensions
68
(2.68)
Fixing Centres
160 (6.3)
69 (2.72)
Fixing Centres
Allowance for
Cable Bends
200 (7.9)
42
(1.65)
61 (2
3
/
8
) o.d.
Vertical Post
250
(9.84)
214
(8.43)
232
(9.13)
Three holes
Ø
6.3 suitable
for M6 fastners
Dimensions in mm (in)
Mark fixing centres
(see Fig. 2.3)
1
2
Drill suitable
holes
3
Fix instrument to
wall using
suitable fixings
Position ‘U’ bolts on pipe
1
2
Position plates over ‘U’ bolts
Secure transmitter to mounting plate
Secure plates
4
3
191 (7.52)
12 (0.47)
Panel Cut-out
96 (3.78)
96
(3.78)
+0.8
–0
92
(3.62 )
+0.03
–0
+0.8
–0
92
(3.62 )
+0.03
–0
Dimensions in mm (in)