HVC 450 kW E-Bus Charger Installation Guide
Revision: 1.2
COMPANY CONFIDENTIAL
Date released: 16-08-2018
Page
61
of
128
NOTICE
A length of 118.11 Inch is required, because the connection of the cables
with the connectors in the Power Cabinet is at the middle of the cabinet.
5.5.5. Move sliding plates of the guidance plates of the cabinet
Preconditions:
Tools: spanner (size 13).
1. Move the sliding plates (B).
2. Tighten the bolts (A).