Procedure
1. Strip the insulation from the end of
the cable (A). For the specifciation,
refer to section
.
2. Prepare the wires:
a. Twist the shield mesh (B).
b. Strip the insulation from the
end of the wires (C) to (F). For
the specifciation, refer to
c. Crimp ferrules onto the end of
the wires and the shield.
3. Loosen the screws on the terminals
(G) to (L).
4. Connect these wires:
a. Shield (B) to terminal X1-47 (G)
b. PS1_OK/14 (C), blue, to terminal X1-46 (L)
c. PS1_OK/13 (D), black, to terminal X1-45 (J)
d. OVP_AC_11 (E), yellow, to terminal X1-43 (K)
e. OVP_AC_14 (F), gray, to terminal X1-44 (H)
5. Tighten the screws to the correct torque. For the specification, refer to section