4. Connect these wires:
a. PE wire (A) to the power cabinet to the terminal X2-1, right (H)
b. PE wire (B) control box 1 to the terminal X2-2, right (J)
c. PE wire (C) to the ground (band-iron) from the terminal X2-2, left (K)
d. If control box 2 is used: PE wire (E) from the control box 2 to the terminal
X2-3, left (M)
e. If control box 3 is used: PE wire (D) from the control box 3 to the terminal
X2-3, right (L)
f. If control box 4 is used: PE wire (G) from the control box 4 to the terminal
X2-4, left (O)
g. If control box 5 is used: PE wire (F) from the control box 5 to the terminal
X2-4, right (N)
5. Tighten the terminal screws to the correct torque. For the specifciation, refer to
section
14.4
Connect the auxiliary AC input cable to the power supply
box
Preliminary requirements
•
Wire cutter
•
Wire stripper pliers
•
Torque screwdriver, cross
•
Crimp pliers
•
AC auxiliary input cable.
Refer to section
•
Ferrules
Procedure
1. Strip the insulation from the end of
the cable (A).
2. Strip the insulation from the wires
(B), (C) and (D). For the
specification, refer to section
.
3. Crimp ferrules onto the end of the
wires.
4. Loosen the screws on the terminals
(E), (F) and (G).
5. Connect these wires:
a. Earthing wire (D) to the
terminal X1-3 (G)
b. Neutral wire (C) to the terminal
X1-2 (F)
c. AC input wire (B) to the terminal
X1-1 (E)
6. Tighten the screws to the correct torque. For the specification, refer to section
A
B
C
D
E F G
Electrical installation of the power supply box
60
6AGA000007-0611-EN | 001