Procedure
1. Loosen the nuts (A) of the cable
glands.
2. Insert the cables (B) through the
glands. For the overview of glands,
refer to section
3. Slide the nuts of the cable glands over
the cables.
4. Tighten the nuts to the correct torque.
For the specifciation, refer to section
14.3
Connect the PE cables in the power supply box
Preliminary requirements
•
Torque screwdriver
•
Wire cutter
•
Wire stripper pliers
•
Crimp pliers
•
•
Ferrules
•
PE wires. Refer to section
Procedure
1. Strip the insulation from the end of
the cables (A) to (G). For the
specification, refer to section
.
2. Crimp ferrules on the ends of the
wires.
3. Loosen the screws on the terminals
(H) to (N).
B
A
M
K
G E
O
C
N
L
J
H
B
F
A
D
Electrical installation of the power supply box