![ABB HT846562 Operation Manual Download Page 56](http://html1.mh-extra.com/html/abb/ht846562/ht846562_operation-manual_4132956056.webp)
Operation Manual / TPL65-A10 / -A30
5 Maintenance / 5.3 Cleaning the compressor during operation
© Copyright 2020 . All rights reserved.
HZTL2482_EN
Rev.E
March 2020
5.3.1
Wet cleaning using external water-pressure vessel
(XC3)
Operating state prerequisites for wet cleaning XC3
NOTICE
To be able to carry out a satisfactory cleaning process which has been
tested and is recommended by ABB Turbocharging, the following pre-
requisites must be fulfilled:
u
Engine load 50 … 85%
u
Start of cleaning cycle in accordance with following description for
wet cleaning operation with XC3.
Operating procedure for compressor wet cleaning with XC3
Operating the water pres-
sure vessel
u
The operating state prerequisites for compressor cleaning with XC3
must be fulfilled.
u
Remove sealing plug (X).
u
Fill vessel with required volume of clean water (see
table Cleaning
parameters
).
u
Screw in sealing plug (X).
Page
54
/
117