
ABB Turbocharger VTC..4
Seite / Page 49
Demontage und Montage
Kap. / Chap. 5
Disassembly and assembly
ABB Turbo Systems Ltd
HZTL 10104
- D -
ABB
7 Tabelle der Anziehmomente
Für allgemeine Schrauben der Festigkeitsklasse 8.8
gelten folgende Anziehmomente:
7 Table of tightening torques
For standard screws with mechanical properties of 8.8
the following tightening torques are applicable:
Pos.
Pos.
Teil-Nr.
Part-no
Anziehmomente [Nm]
Tightening torques [Nm]
Bemerkungen
Remarks
VTC214
VTC254
VTC304
1
21002
M 18
45
M 18
45
M 22
75
2
81109
82006
M 12 x 1,5
45
M 12 x 1,5
45
M 12 x 1,5
45
3
4
5
6
82004
81107
74008
42006
M 16 x 1,5
45
M 16 x 1,5
45
M 16 x 1,5
45
7
81103
M 10
25
M 16
100
M 16
100
8
51011
---
---
M10
25
VTC..4P
Screws with Verbus disc:
Schrauben
Screws
M4
M5
M6
M8
M10
M12
M16
M20
M22
M24
Anziehmomente [Nm]
Tightening torque [Nm]
3
6
10
25
45
75
190
380
430
540
Schrauben
Screws
M10
M12
M16
M20
Anziehmomente [Nm]
Tightening torque [Nm]
75
105
260
500
Schrauben mit Verbusripp-Scheiben:
Hinweis
Die Verbusripp-Scheibe darf im trocke-
nen oder geölten (empfohlen) Zustand
montiert werden, es darf jedoch KEIN
FETT eingesetzt werden um eine Über-
lastung der Schraube zu verhindern.
Für die in der unteren Tabelle angezogenen Schrau-
benverbindungen müssen folgende Anziehmomente
eingehalten werden:
Note
The Verbus disc may be installed in dry
or oiled (preferred) condition, however
NO GREASE may be used to prevent
an overload of the screw.
For the screws in below mentioned table the following
tightening torques have to be applied:
Summary of Contents for HT844572
Page 6: ......
Page 7: ...0 Preliminary remarks Vorbemerkungen ...
Page 8: ......
Page 20: ......
Page 21: ...1 Instructions on safety and hazards Sicherheits und Gefahrenhinweise ...
Page 22: ......
Page 36: ......
Page 37: ...2 Putting into operation Inbetriebnehmen ...
Page 38: ......
Page 55: ...3 Operation and maintenance Betrieb und Unterhalt ...
Page 56: ......
Page 93: ...Troubleshooting Beheben von Störungen 4 ...
Page 94: ......
Page 101: ...Disassembly and assembly Demontage und Montage 5 ...
Page 102: ......
Page 152: ......
Page 153: ...Taking out of operation Ausserbetriebnehmen 6 ...
Page 154: ......
Page 164: ......
Page 165: ...Appendix Anhang 7 ...
Page 166: ......
Page 168: ...10106 ABB Turbo Systems Ltd C Seite Page 2 ABB Turbocharger VTC 4 Anhang Kap Chap 7 Appendix ...
Page 181: ......
Page 206: ......
Page 215: ...ABB Turbo Systems AG Bruggerstrasse 71a CH 5400 Baden Switzerland ABB ...