
Operation Manual / TPL76-C
Removal and installation
7
Remove the turbocharger
7.2
Page 87
© Copyright 2016 ABB. All rights reserved.
Febr
uar
y 2016
H
ZT
L2485_
EN
R
ev
is
ion
C
Remove the insulation shell from the bearing casing and turbine-end
foot. Leave the remaining insulation on the turbocharger.
Version with compressor wheel cooling system
Dismantle the air supply line (also see the chapter entitled Preliminary
remarks / Layout and functioning).
Inspect the lifting gear.
Fasten the lifting gear to the suspension lugs on the bearing casing
and on the turbine-end foot.
Unplug the cable connector on the speed sensor.
Unscrew the fixing screws on the feet.
Lift the turbocharger off the engine and set it down to one side.
WARNING
If support for the turbocharger is not provided or is inadequate, the
turbocharger could tip over during installation or removal and cause a
serious or even fatal injury.
Support the turbocharger at a suitable point.
Cover the oil connection.