
Operation Manual / TPS44-F.. - TPS61-F..
Taking out of operation
9
Shutting down the turbocharger
9.1
Page 116
Apr
il 20
15
H
ZT
L24
12_
EN
R
ev
is
ion E
*) Diameter for turbine casing designs for optional C-ring sealing
NOTICE
Information about the turbine casing design (with / without C-ring
sealing) can be requested from an ABB Turbocharging Service Station.
© Copyright 2015 ABB. All rights reserved.