Operation Manual / A150-M56/66/57/67 - A155-M..
13 Removing and installing 6-nozzle turbine cleaning component (op-
tional) / 13.2 Assembly
© Copyright 2021 ABB. All rights reserved.
HZTL4032_EN
Rev.Q
January 2021
Fig. 124: Pipe assembly
1. Coat thread and contact surfaces of cutting ring with high-temperature grease.
2. Position pipe (51312).
3. Position union nuts (51316) of pipe on connecting piece (51313) and screw-in fitting
(51305) and tighten by hand only.
Fig. 125: Elbow 1 assembly
u
Coat thread and contact surfaces of cutting ring with high-temperature grease.
u
Screw union nuts (51316) of elbows (51311) in the specified order (01, 02, 03, 04, 05) to the
connecting pieces (51313).
Page
162
/
194
Summary of Contents for HT604364
Page 2: ......