![ABB HT584444 Operation Manual Download Page 47](http://html1.mh-extra.com/html/abb/ht584444/ht584444_operation-manual_4139661047.webp)
Operation Manual / TPL65VA32/33
Operation
4
Replacement intervals for turbocharger
components
4.3
Page 45
© Copyright 2016 ABB. All rights reserved.
D
ec
em
ber
2016
H
ZT
L2464_
EN
R
ev
is
ion
D
Parameters influencing rotating components exposed to exhaust gas
Fuel quality (gas, MDO, HFO)
Turbine cleaning frequency
Procedure for turbine cleaning
Load profile
GAS / MDO
Gas inlet casing
50000 … 100000
Gas outlet casing
50000 … 100000
Variable turbine geometry module
(The variable turbine geometry module can be re-
placed with a CPEX variable turbine geometry module
by an ABB Turbocharging service station.)
15000
Turbine diffuser / cover ring
35000 … 50000
Other casings
100000
Axial bearing components
24000 … 36000
Radial bearing components
24000 … 36000
Turbine blades
(due to wear)
- -
Rotor components
See the data on the rating plate
GAS
= Gas Engine
MDO
= Marine Diesel Oil
NOTICE
The specified values are guides and not guaranteed. (
See Influencing
parameters
.)
Expected replacement
intervals [h]
Recommended
replacement intervals [h]