1) If provided
u
Fix a
new
spiral-wound gasket (61050) using a little instant adhesive
(for example "Loctite 454 gel") applied at three equally spaced points
in groove.
u
Fit nozzle ring to gas inlet casing and fix it.
u
Fit gas inlet casing.
u
Use guide studs (90320) as a centering aid and remove them after-
wards.
u
Brush screw threads (61044) with high temperature grease.
Segment connection
u
Position segments (51012) using screws (61044).
Checking
Make sure that collars (C) of segments (51012) rest in groove (S).
Flange connection
u
Position screws (61044).