![ABB HT564933 Operation Manual Download Page 54](http://html1.mh-extra.com/html/abb/ht564933/ht564933_operation-manual_3345746054.webp)
Operation Manual / TPL65VA32/33
Operation
4
Emergency operation TPL..VA
4.5
Page 52
© Copyright 2015 ABB. All rights reserved.
Sept
em
ber
2015
H
ZT
L2464_
EN
R
ev
is
ion
C
Emergency operation TPL..VA
4.5
In the event of failure of the control system or the drive, the variable
turbine geometry module can be fixed by clamping the ring lever (B) using
at least 3 washers (C) spaced around the circumference.
When fixing, the position of the variable turbine geometry module and / or
the blades must be specified by the enginebuilder.
4.5
Detail A