Operation Manual / TPS48-D/E.. - TPS61-D/E..
Removal and installation
7
Remove the turbocharger
7.3
Page 89
Apr
il 2015
H
ZT
L2410_
EN
R
ev
is
ion
D
Remove the turbocharger
7.3
Disconnect all exhaust gas and air lines in accordance with engine
builder’s instructions.
Design with water-cooled bearing casing:
Disconnect water pipes in accordance with engine builder's
instructions.
If provided, remove hard insulation as follows:
Remove screws and plate (B) of bearing casing insulation.
Remove remaining screws of bearing casing insulation (A).
Pull bearing casing insulation up and off. Squeeze bearing casing
insulation together so that it can be removed more easily.
Unplug cable connector of speed sensor.
Fasten lifting gear to bearing casing.
If a gas outlet pipe / elbow is provided, sling lifting gear around it
additionally or fasten it lifting gear using a swivel lifting eye (C).
Unscrew fixing screws (D) on bearing casing.
Lift turbocharger off engine and set it down to one side.
Cover oil connections.
7.3
© Copyright 2015 ABB. All rights reserved.