![ABB HT562167 Operation Manual Download Page 118](http://html1.mh-extra.com/html/abb/ht562167/ht562167_operation-manual_4186309118.webp)
Operation Manual / TPS48-D/E.. - TPS61-D/E..
Taking out of operation
9
Shutting down the turbocharger
9.1
Page 116
Apr
il 2015
H
ZT
L2410_
EN
R
ev
is
ion
D
*) Diameter for turbine casing designs for optional C-ring sealing
NOTICE
Information about the turbine casing design (with / without C-ring
sealing) can be requested from an ABB Turbocharging Service Station.
© Copyright 2015 ABB. All rights reserved.