![ABB HS/S4.2.1 Installation And Operating Instructions Manual Download Page 5](http://html.mh-extra.com/html/abb/hs-s4-2-1/hs-s4-2-1_installation-and-operating-instructions-manual_135005.webp)
5
Connection/installation
Connect cable
Strip cable by 8 mm (max. 9 mm).
Insert cable at 45° in the open terminal
(2 cables per terminal position possible).
With flexible wires only: To open the spring terminal,
press screwdriver downwards.
Danger of death through electric shock!
Must only be installed by professional electrician!
Disconnect power source!
Cover or shield any adjacent live components.
Ensure device cannot be switched again!
Check power supply is disconnected!
Earth and bypass!
Observe SELV on data bus.
WARNING
Spring
screwless
terminal
NC contact
Test connection
Spring terminal
45° cable
GB