![ABB HART FEH300 Commissioning Instruction Download Page 27](http://html.mh-extra.com/html/abb/hart-feh300/hart-feh300_commissioning-instruction_4426027.webp)
Installation
CI/FEP300/FEH300-EN
ProcessMaster / HygienicMaster
EN - 25
3.7.2 Transmitter
The outer shielding of the cable is attached to the busbar via the clip (3) (from the accessory
bag in the connection area).
The shielding for the signal wires function as a driven shield to transmit the measurement
signal.
The cable is attached to the sensor and transmitter according to the connection diagram.
Fig. 29
1
Terminal cover
2
Busbar (SE)
3
Clip
4
Signal and magnet coil cable
Important
The power supply for the optional pre-amplifier is provided via terminals 1S and 2S.
The transmitter automatically detects the sensor and switches to the required supply voltage
on terminals 1S and 2S.
Summary of Contents for HART FEH300
Page 2: ......
Page 39: ...Appendix CI FEP300 FEH300 EN ProcessMaster HygienicMaster EN 37 ...
Page 40: ...Appendix 38 EN ProcessMaster HygienicMaster CI FEP300 FEH300 EN ...
Page 41: ......