background image

2

R E LI AG E A R LI G HTI NG PA N E LBOA R DS - FOR SCR E W COVE R FRONTS ( WITH 5" FRONT E X TE N S ION)

1T

QC

17

30

0

0

E

0

02

4

,G

E

H

53

10

,J

A

N

202

0

ABB Inc.

305 Gregson Drive
Cary, NC 27511 

©Copyright 2020 ABB. All rights reserved. 
Information provided is subject to change without notice. Please verify all details with ABB. All values are design or typical 
values when measured under laboratory conditions, and ABB makes no warranty or guarantee, express or implied, that such 
performance will be obtained under end-use conditions.
ReliaGear is a registered trademarks of ABB Inc.
GE is a registered trademark used under license from General Electric company.

electrification.us.abb.com

Instructions for Mounting

Screw-on fronts with two 5" front extensions mounted to provide 
for a single 10" gutter.

Note:
1.   Panelboard interior mounting screws in box must  

be moved so interior can be offset to accommodate 
either a left or right side mounted additional 10"  
gutter. Positioning of box is critical for proper  
orientation of 10" gutter relative to line in/load out 
conditions. Interior mounting screws can only be  
offset to one side of box.

2.   Push speed nuts onto box flange and both  

extension flanges.

3.   Orientate nuts to face into box. Bolt extensions  

together and attach them to the proper side of the 
front with 1" long trim screws.

4.   Attach front with extensions to box with 1" long  

trim screws.

Front

Speed  
Nuts

Trim Screws

Interior  
Mounting  
Screws

30" Wide Box

Two 5" Front  
Extensions  
(Right Side Mounted)

Reviews: