background image

E-BOX user manual / 2TFH900001A1001

5

WARNING! READ THE FOLLOWING MANUAL CAREFULLY BEFORE
INSTALLING OR WORKING ON EKIP UP

Keep this manual carefully with all the other available documents, including:
Getting Started for first installation, electrical diagrams, drawings and any
descriptive notes.

Keep these documents available during the Ekip UP installation, operating and
maintenance step to facilitate the following operations.

Install the unit in compliance with the environmental, electrical and mechanical
limits described in the product documentation.

Ekip UP has been designed to operate with voltage and current values within
the rated limits: do not install in systems that work at values that exceed
these rated limits.

Follow the safety procedures set by your company.

Do not open lids or doors, do not work on devices before disconnecting all
circuits and checking that they are disconnected with a measuring instrument.

Warnings

Summary of Contents for E-Box

Page 1: ...USER MANUAL 2TFH900001A1001 A E Box ...

Page 2: ...vity for EAM 14 5 3 Programable LED 15 6 EAM ERROR BOOKMARK NOT DEFINED 6 1 Extend external devices to EAM via using MODBUS RTU 15 6 2 Extend external devices to EAM via using MODBUS TCP 16 1 简介 18 1 3 术语定义 18 1 4 内容 18 2 安全 19 3 收货 20 4 安装 21 5 运行 27 5 1 使用 GSM 连接到 EAM 27 5 2 使用现场以太网连接 EAM 28 5 3 可编程 LED 29 6 EAM ERROR BOOKMARK NOT DEFINED 6 1 仅限于中国的 EAM 权限转移 29 6 2 使用 MODBUS RTU 扩展外部设备到 EAM 平台 2...

Page 3: ...moved devices to the EAM plant 4 accessories For optimizing to use and configure E Box and facilitate to use of ABB digital EAM solution the following tasks should be performed in sequence which are available in the product technical documentation user manual startup and electrical diagram Tasks Description Documents 1 Ekip UP catalog 1SDC001051D0201 2 Ekip UP user manual 1SDH002003A1002 4 Ekip UP...

Page 4: ...k thoroughly that neither personal safety or safety devices are placed in danger by the installation method use maintenance or by the instruments used for further information explanations or specific problems contact the nearest ABB This manual has been written only for qualified persons and is not to be intended as a substitute for a suitable course or experience with the safety procedures for th...

Page 5: ...and maintenance step to facilitate the following operations Install the unit in compliance with the environmental electrical and mechanical limits described in the product documentation Ekip UP has been designed to operate with voltage and current values within the rated limits do not install in systems that work at values that exceed these rated limits Follow the safety procedures set by your com...

Page 6: ... the state of the material received and check that it matches the purchase order and is completely undamaged in particular check Ekip UP version Rating Plug size If receipt damage to the packing or inconsistencies between the order and the tags identifying the product or the product itself are detected contact ABB ABB must be alerted within seven days of receipt of the material Introduction Openin...

Page 7: ... UP protect 2 Programable LED 3 Ekip 4K DI DO 4 Introduction and Instructions 5 Temperature sensor input 6 Voltage measurement input 7 Modbus RS 485 8 CAN BUS 9 Energize power port 10 Ethernet port 11 Modbus TCP port 12 Wireless router 13 RJ1 14 RJ2 15 4P 3P selector 16 Antenna Product overview ...

Page 8: ... 25 70 Storage temperature 25 70 Reading information A3 Applications located on terminal board and connector of Ekip Up A4 Indicative devices and connections for control and signaling outside Ekip UP XF Applications located on connector of E BOX K51 COM Communication module Graphical symbols for electrical diagrams Standards IEC 617 Electrical Diagram Characteristics ...

Page 9: ...E BOX user manual 2TFH900001A1001 9 Ekip 4k Diagram K5 K6 H1 H2 H3 H4 K10 K9 Hc Hc Hc Hc ...

Page 10: ...E BOX user manual 2TFH900001A1001 10 Modbus RS 485 CAN Diagram Temperature sensor Diagram H44 H43 H42 HC6 HC5 HC4 ...

Page 11: ...E BOX user manual 2TFH900001A1001 11 Voltage measuring Diagram Voltage measure without external voltage transformer for 3P and 4P Voltage measure without external voltage transformer for 3P and 4P ...

Page 12: ...TFH900001A1001 12 Current measuring Select the selector SA to 3P postion when E BOX works on the 3 poles system see figure 1 Select the selector SA to 4P position when E BOX work on the 4 poles system see figure 2 Diagram ...

Page 13: ...mode of the router is 3G 4G wireless routing If you plug in the 2G 3G 4G card the router will automatically recognize the network Supported banks LTE FDD Bands B1 2 3 4 5 7 8 17 20 28 LTE TDD Bands B38 39 40 41 3G Bands B1 2 5 8 2G Bands B34 39 The router without LTE card installed and have standard SIM card slot press the PUSH button the SIM card slot will release IMPORTANT Before insert SIM card...

Page 14: ...0001A1001 14 Short the RJ1 and RJ2 with Ethernet cable when need to use GSM connectivity to EAM E Box internal network 5 2 Use local Ethernet connectivity for EAM E BOX can also directly to use local Ethernet to connect to EAM ...

Page 15: ...p UP user manual 1SDH002003A1002 6 EAM ABB ABILITYTM ENERGY AND ASSET MANAGER ABB CLOUD 6 1 Extend external devices to EAM via using MODBUS RTU E box retains MODBUS RTU communication port for expanding external devices it can be used for finding external RTU devices and adding them to the EAM When use inside GSM router to find devices add to EAM Keep short RJ1 and RJ2 connect Ethernet port to lapt...

Page 16: ...3A1002 and Getting start of Ekip COM Hub 1SDC200063B0204 IMPORTANT Before scan to find devices please keep the IP of laptop same as Ekip COM HUB 6 2 Extend external devices to EAM via using MODBUS TCP E box retains MODBUS TCP communication port for expanding external devices it can be used for finding external TCP devices and adding them to the EAM When use inside GSM router to find devices add to...

Page 17: ...rt connect RJ2 to laptop which also connect Ekip T P to Ekip UP mini USB infront For further information about find and add devices to EAM please refers to Ekip UP user manual 1SDH002003A1002 and Getting start of Ekip COM Hub 1SDC200063B0204 IMPORTANT Before scan to find devices please keep the IP of laptop same as Ekip COM HUB ...

Page 18: ...Ekip UP 版本 EAM ABB 数字化能源资产管理平台 1 4 内容 手册描述了 E BOX 的特点 包含如下 5 总体概述 6 操作管理 接收 安装和运行 7 在 EAM 平台上识别新设备或者移除旧设备 8 附件 为了优化 E Box 的使用和配置 并方便 ABB digital EAM 解决方案的使用 相 关使用方式可在产品技术文档 用户手册 白皮书和电气图 中找到 链接如下 https new abb com low voltage zh products circuit breakers ekip up 本文件中的资料将包括英文和中文 以满足法律和 或商业产品的需要 概况 信息组织及分布 说明 ...

Page 19: ...有可能的使用情况 ABB 将调查每项危害事件 无论导致该结果的使用情况是否为 ABB 所推荐的 任何实施操作的人员 无论选定的操作程序或使用的仪器是否为 ABB 所推荐的 都 必须认真确保不会危及人身安全和系统安全 如需要进一步了解更多信息 请联系 ABB 本文供专职人员使用 并且不能替代在安全规程方面所必需的课程和经验 客户 安装人员或终端用户有责任应对所有信息安全措施 以防止由于连接到通信网 络而产生的风险 这些风险包括未经授权的人员使用产品 改变产品的正常操作 获 取和修改信息等 客户 安装人员或终端用户需负责确保将这些警告进行公示 即使设备只是暂时无人 看管均需要进行安全上锁 本文件中包含的所有信息均为出版时的最新信息 ABB 保留随时修改文件而不另行 通知的权利 警告 使用 EKIP UP 之前请认真阅读本手册 妥善保管本手册 以及一些可能使用到的文档 以便安装使用本产品时能及时...

Page 20: ...BOX user manual 2TFH900001A1001 20 3 收货 每个订单将会包含以下产品 E BOX PT1000 温度传感器 E BOX 所使用到的线束附件包 打开外包箱 取出相关物件 检查收到的物料的状态 是否符合订单需求 是否完全没有损坏 特别要检 查 Ekip UP 版本 额定插头电流等级 如果发现收货包装损坏或订单与产品标签或产品不一致 请尽快联系 ABB 说明 开箱 物料检查 ...

Page 21: ...ser manual 2TFH900001A1001 21 4 安装 描述 图片 位号 说明 1 Ekip UP 保护版 2 可编程 LED 3 4k 信号输入输出口 4 介绍与说明 5 温度传感器输入 6 电压测量输入 7 RS 485 通讯外扩 8 CAN 总线外扩 9 电源输入 10 以太网口 11 TCP 设备外扩 12 无线网关 13 RJ1 14 RJ2 15 4P 3P 选择开关 16 天线 产品概况 ...

Page 22: ...Hz 额定功率 68Wmax 保险丝 3 15A 操作温度 25 70 存储温度 25 70 阅读信息 A3 Ekip UP 产品上的连接器或插接端子 A4 E BOX 箱体外用于控制和信号的指示设备和连接 XF E BOX 箱体上安装的指示和连接器 K51 Ekip UP 保护版 K51 SIGN 装于 Ekip UP 上的 4k 信号模块 K51 TEMP 装于 Ekip UP 上的温度测量模块 K51 SUPPLY 装于 Ekip UP 上的电源模块 K51 COM 装于 Ekip UP 上的通讯模块 电气图图形符号 标准 IEC 617 电气图 参数 ...

Page 23: ...E BOX user manual 2TFH900001A1001 23 4k 信号输入输出口 接线图 K5 K6 H1 H2 H3 H4 K10 K9 Hc Hc Hc Hc ...

Page 24: ...E BOX user manual 2TFH900001A1001 24 RS 485 通讯 CAN 总线外扩端口 电气图 温度传感器输入 电气图 H44 H43 H42 HC6 HC5 HC4 ...

Page 25: ...E BOX user manual 2TFH900001A1001 25 电压测量 电气图 无外置 3P 和 4P 变压器的电压测量 采用外置 3P 和 4P 变压器的电压测量 ...

Page 26: ...E BOX user manual 2TFH900001A1001 26 电流测量 当 E BOX 工作在 3 极系统时 选择开关 SA 需要拨到 3P 位置 如图片 1 所 示 当 E BOX 工作在 4 极系统时 选择开关 SA 需要拨到 4P 位置 如图片 2 所 示 电气图 ...

Page 27: ...M 连接到 EAM E BOX 提供了内部 3G 4G GSM 的交换机 可用于向 ABB EAM 平台发布数据 若插入 2G 3G 4G 信号卡或数据卡 交换机会自动识别并连接至网络 支持波段 LTE FDD 频带 B1 2 3 4 5 7 8 17 20 28 LTE TDD 频带 B38 39 40 41 3G 频带 B1 2 5 8 2G 频带 B34 39 交换机携带标准 SIM 卡槽 默认出厂没有 LET 卡片 按压 PUSH 按钮 SIM 卡槽将会自动弹 出 重要 插入 SIM 卡片之前 请断开 E BOX 电源 ...

Page 28: ...E BOX user manual 2TFH900001A1001 28 使用 GSM 连接至 EAM 时 还需要使用普通网线短接背部互感器舱内的 RJ1 和 RJ2 E Box 内部框图 5 2 使用现场以太网连接 EAM E BOX 提供可直接使用现场以太网连接 EAM 平台 RJ1 和 RJ2 不能短接 ...

Page 29: ...提供一个可使用的邮箱账号 这个邮箱账号将被转移为 EAM 的所有者权 限 当接收到 EAM 邀请后 登录邮箱内的邀请地址进入 EAM 界面接收权限 如果有必要请在 EAM 的配置界面内移除 abbebox 126 com 界面 试用期 1 个月到期之后 如果需要继续使用 ABB EAM 欢迎使用 ABB Macketplace 链接 https marketplace ability abb com cn zh CN apps 57081 EAM 进行订阅 如若需要帮 助 烦请联系 ABB 6 2 使用 MODBUS RTU 扩展外部设备到 EAM 平台 E box 保留了扩展外部设备的 MODBUS RTU 通信端口 可用于寻找外部 RTU 设备并将其添加到 EAM 平台中 当使用内部 GSM 网关来添加设备到 EAM 时 保持 RJ1 和 RJ2 用普通网络线短接 将网络口连接 到电脑...

Page 30: ... 接口上 需要更多关于扫描和增加设备到 EAM 的信息 请参考 Ekip UP 使用手册 1SDH002003A1002 和 Ekip COM HUB 入门手册 1SDC200063B0204 重要 扫描设备之前 需要保持电脑的 IP 和 Ekip COM HUB 的 IP 一致 6 3 使用 MODBUS TCP 外扩设备到 EAM 平台 E box 保留了扩展外部设备的 MODBUS TCP 通信端口 可用于寻找外部 TCP 设备并将其添加到 EAM 平台中 当使用内部 GSM 网关来添加设备到 EAM 时 保持 RJ1 和 RJ2 用普通网络线短接 将网络口连 接到电脑 同时将 Ekip T P 连接到 Ekip UP 前端 USB 端口上 ...

Page 31: ...1 31 若需要通过以太网增加和上传数据到 EAM 网络时 需要接入至侧面的以太网口 连接 RJ2 到电 脑上 同时将 Ekip T P 连接到 Ekip UP 前端的 mini USB 接口上 需要更多关于扫描和增加设备到 EAM 的信息 请参考 Ekip UP 使用手册 1SDH002003A1002 和 Ekip COM HUB 入门手册 1SDC200063B0204 重要 扫描设备之前 需要保持电脑的 IP 和 Ekip COM HUB 的 IP 一致 ...

Reviews: