2 Installation
2.2.3. Fitting the attachments of the continuous cable package - IRBDP MH 2 CE and IRBDP SW 2 CE
49
3HAC027309-001 Revision: D
©
Co
py
rig
h
t 200
6-
201
0 ABB. All righ
ts reser
v
ed.
xx0600003149
The upper arm part of the cable package IRBDP MH 2 CE and IRBDP SW 2 CE.
Required equipment
The following equipment are required for fitting the cabling package attachments.
A
Ball joint housing
B
Process cable package
C
Hose support
D
Tension arm unit
E
Process cable support, axis 6
F
Arm protection
G
Bracket, hose support
H
Hose reinforcement
Equipment
Art. no
Note
Locking liquid
3HAB7116-1
Loctite 243.
For locking the screws.
Standard toolkit, DressPack/SpotPack 3HAC17290-7
The contents are defined in
section
.
Other tools and procedures may be
required. See references to these
procedures in the step-by-step
instructions below.
These procedures include
references to the tools required.
Continued
Continues on next page
Summary of Contents for DressPack IRB 6620
Page 1: ...ABB Robotics Product manual DressPack SpotPack IRB 6620 ...
Page 2: ......
Page 8: ......
Page 288: ......
Page 289: ......