Sea freight light package (cardboard box)
Perform the following steps to unpack the UPS equipment from the light packaging:
1.
Cut the two green straps that lock down the cardboard box. Remove the box by pulling up the
upper part of it, and then slide up the rest of the carton box starting from the bottom to the top.
2.
Cut the tape from the four pieces of polystyrene and the remove them from the unit.
3.
While paying close attention and without damaging the cabinet, unwrap the plastic film and
remove, by pulling up, the upper part of the bag that covers the unit. Note that the edges are
not protected.
4.
Mount the 4x adjustable feet. (Feet are in the accessory box, or at the bottom of the unit).
5.
After having placed the UPS in its final position, disassemble the left and right socket and mount
the front and back painted sockets.
6.
Keep the packaging materials in case the unit has to be shipped back.
1)
2)
3)
Fig 4.2.2-1: Sea freight light package unpacking sequence
Summary of Contents for DPA UPScale ST120
Page 1: ... Copyright 2017 ABB All rights reserved User Manual DPA UPScaleTM ST S2 10 200 kW ...
Page 76: ...Modifications reserved Page 76 79 10 Attachments 10 1 Technical data sheet ...
Page 78: ......
Page 79: ... Copyright 2017 ABB All rights reserved Technical data sheet DPA UPScaleTM ST S2 10 200 kW ...
Page 104: ......
Page 105: ... Copyright 2017 ABB All rights reserved Technical data sheet DPA UPScaleTM ST S2 10 200 kW ...