ABB DOL Starter Installation Instructions Download Page 2

Connection Data 

 

Type (400Vcoil) 

Type (230V coil) 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Circuits 

 

Standard circuit 

Special circuits 

 

Line-to-line plus remote 3-wire control          Two-wire controls 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Fitting an extra control device 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 
 
 
 
 
 
 
 
 
 
 

Council of European Communities Directives: 

The products in 

this publication conform to relevant EEC Directives and EN 
Standards. Installation and use of such products must be carried 
out by competent, properly trained personnel, complying with any 
instructions supplied by the manufacturer. Liability for improper 
incorporation, assembly, use, processing, storing or handling of 
goods remains the sole responsibility of the individual, or company 
carrying out such work. This publication is for information only.

 

Whilst every care has been taken in the preparation of this leaflet, 
no liability is accepted for any consequence of its use. No licence 
to use any patent should be assumed. All dimensions are 
approximate only and subject to change without notice, as are 
other technical features resulting from continual development and 
improvement. 

 

For further information please contact your ABB Technical Helpline 02476 368500 

L3 

L1 

13 

14 

Start 

Remote 
start 

Remove 
link 

Remote 
stop 

Stop/reset 

A2 

A1 

95 

96 

L3 

L1 

13 

14 

Remove 
link 

Reset 

A2 

A1 

95 

96 

Control 
contact 

L1 

 

L2 

 

L3 

 

 

3~ 

95 

96 

97 

98 

A1 

A2 

Start 

Stop/ 

reset 

(A) 

(B) 

(C) 

13 

14 

A knockout is provided in 
the lid of the DOL for an 
extra control device. 
 
1.  Remove lid of starter 

2.  Cut around serrated 

label insert  
and remove 

3.  Remove front 22mm 

knockout. 

4.  Fit control device kit. 

U    V     W 

(A)  (B)  (C) 

3~ 

L1  L2  L3       E 

1    3    5 

A1 

2      4     6 

U    V     W 

(A)  (B)  (C) 

3~ 

N        L1  L2  L3       E 

1    3    5 

A1 

2      4     6 

N      L 

1~ 

N           L       E 

1    3    5 

A1 

2      4     6 

Note: For 
Single phase 
Operation link 
1 to A1, 
3 to 2 as shown. 

Reviews: