INSTALLATION AND WIRING 

BDS0009 rev 14   

 

CBT-STAT, CBT-STAT-H 

 

 

 

  

 

 

©ABB 2021 All Rights Reserved. 

Subject to change without notice 

 

BDS0

00

9 r

ev 1

 

MOUNTING

 

 

 

Install  the 

CBT-STAT

  or 

CBT-STAT-H

  on  an  easily  accessible 

interior wall, approximately 60” (1.5 m) above the floor in an area 

of average temperature 

 

Avoid direct sunlight or other heat sources (e.g. the area above 
radiators or other heat-emitting equipment) 

 

Avoid  locations  behind  doors,  on  outside  walls  and  above  or 
below air discharge grills and diffusers 

 
IMPORTANT NOTICE AND SAFETY ADVICE 
  

This device is for use as an operating control. It is NOT a safety device. 

Where a device failure endangers human life and/or property, it is the 

responsibility of the client, installer and system designer to add additional 

safety devices to prevent a system failure caused by such a device failure. 

  

Ignoring specifications and local regulations may cause equipment damage 

and endangers life and property. Tampering with the device or 

misapplication will void warranty. 

INSTALLATION

   

1.

 

Connect the 

CB Line 

field controller to the terminals of 

the power case according to the wiring diagram. 

2.

 

Attach the mounting plate to the flush-mounting box. 

Make sure that the nipple with the front-holding screw is 

facing to the ground. Make sure the mounting screw 

heads do not s

tand out more than 0.2” (5 mm) off the 

surface of the mounting plate. 

3.

 

Slide the two latches located on the top of the front part 

into the hooks at the upper side of the mounting plate. 

4.

 

Carefully lower the front part and continue pressing 

gently until the front part is fully connected. 

5.

 

With a Phillips-type screwdriver (size #2), carefully tighten 

the front holding screw to secure the front part to the 

mounting plate. This screw is located on the front lower-

side of the unit. 

 

 

 

 

 