
3
Charge the CheckMaster
Charge the CheckMaster for a minimum of four hours before first
use.
a
Connect the mains adaptor to the CalMaster2.
b
Plug the CalMaster2 mains adaptor into the power socket.
c
Recharge for at least four hours.
4
Install the CalMaster2 IRIS software
Insert the CD into the computer; the install program should start
automatically. If it does not, from the Windows
Start
menu, select
Run…
and type
D:\Setup.exe
(where D is the drive letter of the CD)
and click
OK
or press
Enter
.
Follow the on-screen instructions to install.
To run the software, select
Start | Programs | ABB | CalMaster2
.
Refer to the instruction manual (IM/VMC2) for complete details of
the CalMaster2 IRIS software.
3 2 1
b
a
c
5
Register CalMaster2
From the CalMaster software, select
Help | Register
CalMaster2…
A registration screen appears:
1. Type the
User name
,
Company name
and
Customer
identification number
.
2. Select to either create a PDF of the registration or send the
details by email:
–
To create a pdf, select the
Create a pdf file for
printing or faxing
check box.
–
To send an email, leave the
Create a pdf file for
printing or faxing
check box unselected.
3. Click
Next
. Either an e-mail is sent to
automatically or a PDF is created:
–
If an e-mail was sent, a response is received within 24
hours. A confirmation message that the e-mail has
been sent appears.
–
If a PDF was created, print the PDF and either send it
to:
ABB Limited
CalMaster Helpline
Oldends Lane, Stonehouse
Gloucestershire
GL10 3TA
UK
or Fax it to: +44 (0)1453 829671
4. Click
Close
to exit CalMaster2.
6
Connect the CheckMaster to the Computer
With the CalMaster2 software running:
a
Slide the cover down to reveal the serial port.
b
Connect the RS232 cable to the CalMaster2
c
Connect the RS232 cable tothe computer.
From the CalMaster2 IRIS software, click the
button. The
software checks that the CalMaster2 is connected.
7
Verify a Flow Meter
Follow the detailed instructions in the manual (IM/VCM2) to
connect to a flow meter.
Note.
The 'Customer identification number' is printed on the
label of the CD.
Note.
As this is the first time that the CheckMaster has been
used, no flow meters are listed.
a
b
c
The Company’s policy is one of continuous product
improvement and the right is reserved to modify the
information contained herein without notice.
Printed in UK (09.06)
© ABB 2006
ABB Limited
Oldends Lane, Stonehouse
Gloucestershire
GL10 3TA
UK
Tel:+44 (0)1453 826661
Fax:+44 (0)1453 829671
ABB Inc.
125 E. County Line Road
Warminster
PA 18974
USA
Tel:+1 215 674 6000
Fax:+1 215 674 7183
IM/VCM2/QRG
Issue 2