RECOM MENDATIO NS FOR ESTAB LISHING A RO BUS T W IRELES SHART NETWOR K
INSTA LL ATIO N
24
3BNP1029 12 C
5
Installation
Installation, operation, and maintenance may only be carried out by qualified electricians.
Follow the installation instructions described. When installing and operating the device, the
applicable regulations and safety directives (including national safety directives), as well as
general technical regulations, must be observed. Observe the technical data in this user man-
ual and subsequent documentation (
–
In order to protect the modules against electrostatic discharge when working on control
cabinets (or junction boxes), the operating personnel must remove electrostatic dis-
charge before opening junction boxes or control cabinets and before touching the gate-
way.
–
The gateway is snapped onto a DIN rail within a control cabinet or junction box. The con-
trol cabinet/box must meet the requirements of EN/IEC 60950-1:2001 in terms of fire pro-
tection shielding.
–
The device must not be opened or modified. Do not repair the device yourself; replace it
with an equivalent device. Repairs may only be carried out by ABB. The manufacturer is
not liable for damage resulting from violation.
–
The IP20 degree of protection (EN/IEC 60529) of the device is intended for use in a clean
and dry environment. The device must not be subject to any strain or load, which exceeds
the limits described.
–
In the electrical system of the building, a 2-pos. disconnecting device must be provided to
isolate the equipment from the supply circuit.
The device is designed for installation in zone 2, potentially explosive areas.
Correct usage in potentially explosive areas.
–
Do not use the device in atmospheres with a danger of dust explosions.
–
Observe the specific conditions of use (3BNP102683 D3) in potentially explosive
areas.
–
Install the device in housing (control or junction box) that meets the require-
ments of EN/IEC 60079-15 and has at least IP54 protection (EN/IEC 60529).
–
Only passive antennas may be operated with the gateway.
–
When installing and connecting the supply and signal circuits, observe the re-
quirements of EN/IEC 60079-14. Only devices which are designed for operation
in Ex zone 2 and are suitable for the conditions at the installation location may be
connected to the circuits in zone 2.
In potentially explosive areas, snap the device on or off the bus foot (T-bus con-
nector) and connect or disconnect the cables only when the power is discon-
nected.
The device must be stopped and immediately removed from the Ex area if it
–
is damaged.
–
was subject to an impermissible load.
–
was stored incorrectly.
–
malfunctions.
Summary of Contents for AWIN GW100
Page 1: ... ENERGY INDUSTRIES ABB Wireless Industrial Network AWIN GW100 User Manual ...
Page 2: ......
Page 8: ......
Page 10: ......
Page 12: ......
Page 68: ... Visit us www abb com oilandgas Document Number 3BNP102912 Rev C ...