Tightening torques
Torque
Screw size
4 N·m (3 lbf·ft)
M5
9 N·m (6.6 lbf·ft)
M6
22 N·m (16.2 lbf·ft)
M8
42 N·m (31 lbf·ft)
M10
70 N·m (52 lbf·ft)
M12
120 N·m (89 lbf·ft)
M16
For the drawings and dimensions of the grid cable terminals, see the dimension drawings.
Terminal and lead-through data for the generator cables
You can connect cable lugs to both sides of the cable connection busbar. The lead-throughs
are acquired separately by the customer. Generator cables enter the cabinet in the plinth.
Generator cable connection busbars are presented below. See also the dimension drawings.
94 Technical data
Summary of Contents for ACS880-87LC-3200A
Page 2: ......
Page 4: ......
Page 10: ...10 ...
Page 18: ...5 1 3 4 6 8 7 2 18 Safety instructions ...
Page 48: ...48 ...
Page 68: ...68 ...
Page 75: ...b 3 a 2 6 c 4 Air flow direction is towards the converter module Maintenance 75 ...
Page 85: ...14 Open the installation stand optional and place it in front of the module 14 Maintenance 85 ...
Page 108: ...108 ...
Page 112: ...Description CAN bus connection XCAN XCAN 112 BCU x5 control unit ...
Page 116: ...116 Dimension drawings ...
Page 117: ...Dimension drawings 117 ...
Page 118: ...118 Dimension drawings ...
Page 130: ...130 ...