Go through these steps before you begin any installation or maintenance work.
1. Clearly identify the work location and equipment.
2. Disconnect all possible voltage sources. Make sure that re-connection is not possible.
Lock out and tag out.
• Open the main disconnecting device of the drive.
• If you have a permanent magnet motor connected to the drive, disconnect the
motor from the drive with a safety switch or by other means.
• Disconnect all dangerous external voltages from the control circuits.
• After you disconnect power from the drive, always wait 5 minutes to let the
intermediate circuit capacitors discharge before you continue.
3. Protect any other energized parts in the work location against contact.
4. Take special precautions when close to bare conductors.
5. Measure that the installation is de-energized. Use a quality voltage tester.
• Before and after measuring the installation, verify the operation of the voltage
tester on a known voltage source.
• Make sure that the voltage between the drive input power terminals (L1, L2, L3)
and the grounding (PE) busbar is zero.
• Make sure that the voltage between the drive output terminals (T1/U, T2/V,
T3/W) and the grounding (PE) busbar is zero.
• Make sure that the voltage between the drive DC terminals (UDC+ and UDC-)
and the grounding (PE) terminal is zero.
Note:
If cables are not connected to the drive DC terminals, measuring the
voltage from the DC terminal screws can give incorrect results.
6. Install temporary grounding as required by the local regulations.
7. Ask for a permit to work from the person in control of the electrical installation work.
■
Additional instructions and notes
WARNING!
Obey these instructions. If you ignore them, injury or death, or damage to the
equipment can occur.
If you are not a qualified electrical professional, do not do installation or
maintenance work.
16 Safety instructions
3
Summary of Contents for ACS880-11
Page 1: ... ABB INDUSTRIAL DRIVES ACS880 11 drives Hardware manual ...
Page 2: ......
Page 4: ......
Page 26: ...26 ...
Page 52: ...52 ...
Page 82: ...82 ...
Page 95: ...R6 R8 IP21 R6 R8 IP55 Electrical installation IEC 95 ...
Page 103: ...R6 1 5 N m 0 5 N m Electrical installation IEC 103 ...
Page 104: ...R8 1 5 N m 0 5 0 6 N m 104 Electrical installation IEC ...
Page 116: ...R6 R8 UL Type 1 R6 R8 UL Type 12 116 Electrical installation North America NEC ...
Page 142: ...142 ...
Page 154: ... Fan arrow must point up 154 Maintenance ...
Page 160: ...160 ...
Page 181: ... Package dimensions R6 R3 R8 Technical data 181 ...
Page 202: ...R3 IP21 UL Type 1 3AXD50000045323 202 Dimension drawings ...
Page 203: ...R3 Option B056 IP55 UL Type 12 3AXD50000045322 Dimension drawings 203 ...
Page 204: ...R6 IP21 UL Type 1 3AXD50000045353 204 Dimension drawings ...
Page 205: ...R6 Option B056 IP55 UL Type 12 3AXD50000045352 Dimension drawings 205 ...
Page 206: ...R8 IP21 UL Type 1 3AXD50000047667 206 Dimension drawings ...
Page 207: ...R8 Option B056 IP55 UL Type 12 3AXD50000047667 Dimension drawings 207 ...
Page 208: ...208 ...
Page 225: ... Declarations of conformity The Safe torque off function 225 ...