32 Standard Commissioning Process
Preparing the converter for start-up
Connecting the auxiliary supply
The ACS580MV uses different auxiliary voltage supplies.
•
3 phase supply is needed for powering the cooling fans. According to option the power
supply can also come from the integrated transformer.
•
The control section is powered by external single phase AC power supply.
•
Individual 1 phase AC power supply that feed to the optional section, such as cabinet
heater, MBU/SBU/MAU control circuit.
The main breakers of the auxiliary power supply are located in the control cabinet.
Check terminal X1 terminal before energizing auxiliary supply
In order to prevent device (such as BCON, AC500, etc.) from damaging by wrong wiring,
new design of X1 terminal with pluggable connectors (Plug4P&5P) was introduced. The
connectors are not allowed to be plugged into X1 until examination finished by service
engineer as following procedures.
1. Tear off the warning label after confirming it is intact.
NOTICE
For old X1 terminal, disconnect X1:20(W41501), 22(W41502), 26(W41503),
DI0(W45002) and DI1(W45003) on PLC,F24V:5(W41501),X24V1:4(W41610) shown in
below pictures. Make sure all pulled out wiring have well insulation.
X1 terminal (New)
X1 terminal (Old)
Summary of Contents for ACS580MV
Page 1: ... ABB INDUSTRIAL DRIVES ACS580MV Commissioning Manual 200kW to 6300 kW 3 3kV to 11 kV ...
Page 4: ......
Page 8: ...8 ...
Page 43: ...Standard Commissioning Process 43 Press the button Load SW and wait till update is finished ...
Page 60: ...60 Standard Commissioning Process Complete the installation press Finish ...
Page 83: ...Standard Commissioning Process 83 ...
Page 96: ...96 Standard Commissioning Process ...
Page 121: ...Option 121 IO signals ...
Page 122: ...122 Option Panel control interface System fault ...
Page 140: ...140 Option ...
Page 148: ...148 Preventive Maintenance ...