
Maintenance
After the operation of the circuit is validated at start-up, the STO function shall
be maintained by periodic proof testing. In high demand mode of operation, the
maximum proof test interval is 20 years. In low demand mode of operation, the
maximum proof test interval is 5 years; see section
. It is
assumed that all dangerous failures of the STO circuit are detected by the proof
test. To perform the proof test, do the
Validation test procedure (page 152)
.
Note: See also the Recommendation of Use CNB/M/11.050 (published by the
European co-ordination of Notified Bodies) concerning dual-channel safety-related
systems with electromechanical outputs:
•
When the safety integrity requirement for the safety function is SIL 3 or PL e
(cat. 3 or 4), the proof test for the function must be performed at least every
month.
•
When the safety integrity requirement for the safety function is SIL 2 (HFT =
1) or PL d (cat. 3), the proof test for the function must be performed at least
every 12 months.
The STO function of the drive does not contain any electromechanical components.
In addition to proof testing, it is a good practice to check the operation of the
function when other maintenance procedures are carried out on the machinery.
Include the Safe torque off operation test described above in the routine
maintenance program of the machinery that the drive runs.
If any wiring or component change is needed after start-up, or the parameters are
restored, do the test given in section
Validation test procedure (page 152)
.
Use only spare parts approved by ABB.
Record all maintenance and proof test activities in the machine logbook.
■
Competence
The maintenance and proof test activities of the safety function must be carried
out by a competent person with adequate expertise and knowledge of the safety
function as well as functional safety, as required by IEC 61508-1 clause 6.
156 The Safe torque off function
Summary of Contents for ACS180
Page 1: ...ABB MACHINERY DRIVES ACS180 drives Hardware manual...
Page 2: ......
Page 4: ......
Page 12: ...12...
Page 36: ...36...
Page 41: ...4 Tighten the mounting screws Mechanical installation 41...
Page 58: ...58...
Page 76: ...76...
Page 90: ...90...
Page 130: ...Frame R0 130 Dimension drawings...
Page 131: ...Frame R1 Dimension drawings 131...
Page 133: ...Frame R3 Dimension drawings 133...
Page 134: ...Frame R4 134 Dimension drawings...
Page 142: ...142...
Page 162: ...Declarations of conformity 162 The Safe torque off function...
Page 163: ...The Safe torque off function 163...
Page 164: ...164 The Safe torque off function...
Page 165: ...The Safe torque off function 165...
Page 166: ...166...