05 TRANSPORTATION, STORAGE AND DISPOSAL
3BHS206977 E01 REV H
ACS1000I AIR-COOLED
USER MANUAL
77/174
5.5.3
Storage and handling of spare parts
NOTICE
Check the spare parts immediately after receipt for damages. Report any damage to the
shipping company and the ABB service organization.
Observe the following to maintain spare parts in good condition and to keep the warranty valid
during the warranty period:
- Keep spare parts in their original packaging
- Store printed circuit boards in anti-static bags or boxes
- Storage temperature range: -5 °C – +55 °C
- Storage place requirements:
• Free of vibration and shock
• Protected against dust, sand, vermin and insects
• Free of corrosive gases, salt or other impurities that could damage
electronic equipment
• Dry with no condensation
• Relative air humidity: 5 – 85%
If in doubt whether the maximum allowed humidity is exceeded, protect the spare parts
by an external heater.
- Do not touch a component without wearing a wrist grounding strap.
- Put the component on a grounded working surface protected against
electrostatic discharges
- Hold the component only at the edge
5.6
Disposal of packaging materials and components
Apply ESD handling precautions before handling these devices.
Electronic devices (eg, circuit boards, semiconductors) are sensitive to
electrostatic discharge (ESD), which can damage these devices.
Dispose of the packaging materials and the components at the end of the lifetime
of the drive according to local regulations.
Summary of Contents for ACS1000i air-cooled
Page 1: ... MEDIUM VOLTAGE AC DRIVES ACS1000i air cooled User manual ...
Page 3: ...Contents ACS1000i air cooled User manual ...
Page 5: ... 01 About this manual 01 5 16 ...
Page 16: ......
Page 17: ... 02 Important safety information 02 17 28 ...
Page 28: ......
Page 29: ... 03 Power electronics and cabinet features03 29 56 ...
Page 57: ... 04 Control system 04 57 70 ...
Page 71: ... 05 Transportation storage and disposal05 71 78 ...
Page 78: ......
Page 79: ... 06 Mechanical installation 06 79 88 ...
Page 88: ......
Page 89: ... 07 Electrical installation07 89 104 ...
Page 105: ... 08 Commissioning 08 105 110 ...
Page 110: ......
Page 111: ... 09 Operation 09 111 124 ...
Page 125: ... 10 CDP control panel 10 125 148 ...
Page 149: ... 11 Preventive and corrective maintenance 11 149 172 ...
Page 173: ......