![ABB ACB530 Series User Manual Download Page 10](http://html.mh-extra.com/html/abb/acb530-series/acb530-series_user-manual_2918010.webp)
2-4 Installation
MN796SUP
2.1.4 Preparing for Installation
2.1.4.1 Lifting the Drive
R8
Warning: Handle and ship floor mounted enclosures only in the upright position. These units are not designed to be laid on
their backs.
1. Use a pallet truck to move the package/enclosure to the installation
site.
2. Remove the cabinet side panels from UL Type/NEMA 1 and 12
enclosures for access to the cabinet/pallet mounting bolts. (6 torx
screws hold each cabinet side panel in place. Leave the side panels
off until later.)
3. Remove the 4 bolts that secure the cabinet to the shipping pallet.
Warning: Use the lifting lugs/bars at the top of the unit to lift R8 drives.
4. Use a hoist to lift the drive. (Do not place drive in final position until
mounting site is prepared.)
Summary of Contents for ACB530 Series
Page 4: ...ii MN796SUP ...
Page 6: ...1 2 Introduction MN796SUP ...
Page 20: ...3 6 Maintenance MN796SUP ...
Page 26: ...4 6 Technical Data MN796SUP ...