Quick installation, commissioning and operating flowchart
See chapter/section
Task
Prepare the installation location (page 27)
Plan and prepare the installation location.
Acquire the accessories needed (SIM card,
power cables, sensors, etc.).
General requirements (page 24)
Supported motor types (page 25)
Examine the ambient conditions, input power
connection, compatibility of the motor, mo-
tor connection, and other technical data.
Unpack and examine the units.
Make sure that all necessary accessories and
equipment are present and correct.
MACHsense-R order information (page 24)
SIM card and subscription order informa-
tion (page 24)
Only intact units can be started up.
Standard sensors order informa-
tion (page 24)
Install the antennas (page 27)
Install the antennas
Configure internet connection (page 28)
Configure internet connection and activate
SIM card
Activate the SIM card (page 28)
Activate SIM card or use Ethernet connectiv-
ity
Installing/removing the SIM card (page 29)
Connecting LAN cable (page 67)
Connect the power supply cable (page 30)
Connect the power supply
Commission the MACHsense-R (page 32)
Commission the MACHsense-R
14 Introduction
Summary of Contents for Ability MACHsense-R
Page 1: ...ABB MOTION SERVICES ABB Ability MACHsense R MSR1608 Data acquisition unit User manual...
Page 2: ......
Page 4: ......
Page 8: ...8...
Page 12: ...12...
Page 18: ...18...
Page 20: ...Process overview diagram 20 Getting started...
Page 26: ...26...
Page 34: ...34...
Page 42: ...42...
Page 46: ...46...
Page 50: ...50...
Page 58: ...58...
Page 66: ...66...