![ABB 6136/100C-101 Operating Instructions Manual Download Page 41](http://html.mh-extra.com/html/abb/6136-100c-101/6136-100c-101_operating-instructions-manual_2295041.webp)
ENG
41
8.2
Installation of room/control panel
This unit may only be installed in flush-mounting box 6136/UP.
1. Fit terminals to the lines (230V, TP if
required) (see chapter "Connection").
2. Connect terminals to the unit.
3. Insert unit into flush-mounting box and
tighten screws (Fig. 64).
Fig. 64
4. Attach the frame and secure it using the
enclosed screw (Fig. 65).
Fig. 65