ABB-Welcome
Mounting / Installation
|
— 55 —
Pos : 79 /Busc h-J aeg er (Neustr ukt ur)/Modul- Struktur /O nline-Dokument ati on/Übersc hrift en (--> Für alle D okument e <--)/1. Ebene/M - O /Mont age / I nst allation @ 18\ mod_1302613966111_15.doc x @ 103373 @ 1 @ 1
8
Mounting / Installation
Pos : 80 /Busc h-J aeg er (Neustr ukt ur)/Modul- Struktur /O nline-Dokument ati on/Sic herheit (--> Für alle Dokumente <--)/Warnhinweis e/Sic herheit - Ni eders pannungs- und 230 V-Leit ungen @ 18\ mod_1302617821491_15. doc x @ 103465 @ @ 1
Warning
Electric voltage!
Risk of death and fire due to electrical voltage of 100-240 V.
–
Low-voltage and 100-240 V cables must not be installed together in
a flush-mounted socket!
In case of a short-circuit there is the danger of a 100-240 V load on
the low-voltage line.
Pos : 81 /Busc h-J aeg er (Neustr ukt ur)/Modul- Struktur /O nline-Dokument ati on/Sic herheit (--> Für alle Dokumente <--)/Warnhinweis e/Sic herheit - F ac hkennt niss e @ 18\ mod_1302774384017_15.doc x @ 103564 @ 2 @ 1
8.1
Requirements for the electrician
Warning
Electric voltage!
Install the device only if you have the necessary electrical engineering
knowledge and experience.
•
Incorrect installation endangers your life and that of the user of the
electrical system.
•
Incorrect installation can cause serious damage to property, e.g.
due to fire.
The minimum necessary expert knowledge and requirements for the
installation is as follows:
•
Apply the "five safety rules" (DIN VDE 0105, EN 50110):
1.
Disconnect from power source;
2.
Secure against being re-connected;
3.
Ensure that there is no voltage;
4.
Connect to the earth;
5.
Cover or barricade adjacent live parts.
Summary of Contents for 5102xDN Series
Page 9: ...ABB Welcome Terminal description 9 4 1 1 Lock connected with terminals 3 4 ...
Page 10: ...ABB Welcome Terminal description 10 4 2 Camera module Fig 3 Terminal description ...
Page 13: ...ABB Welcome Terminal description 13 ...
Page 15: ...ABB Welcome Terminal description 15 ...
Page 59: ...ABB Welcome Mounting Installation 59 Cover frame ...
Page 60: ...ABB Welcome Mounting Installation 60 Flush mounted box ...
Page 61: ...ABB Welcome Mounting Installation 61 Rain hood ...