Requirements
&KDSWHU
0RXQWLQJLQFXELFOHV
(DUWKTXDNHSURWHFWLRQ
The standard IEEE 693 draft 5 states recommended practice for seismic design of sub-
stations. The cubicle should be able to sustain a maximum ground acceleration (ZPA)
equivalent to 0.5g in areas with a high risk for seismic shocks.
3RZHUORVVHV
The temperature rises in a cabinet due to the power losses from the equipment housed
in it. It also depends on the cabinet’s degree of protection (airtightness). Self-ventilated
cooling is also highly dependent on the type of equipment involved and its location in
the cabinet.
Equipment placed to ensure free air circulation around a heat source can be expected to
emit more heat for the same increase in temperature than equipment which is not so well
situated. Expected power losses at certain permissible temperature rises can also only
be given as guidelines as shown in
figure 49
,
figure 50
and
figure 51
.
)LJXUH 7HPSHUDWXUHULVH,3YHQWLODWHGGRRUDQGUHDUSDQHOERWKDWWKHWRS
DQGRQWKHERWWRP
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
en04000320.vsd
300
500
700
900
1100
1300
1500
1700
1900
0
Power losses (W)
Tem
perat
ure ri
s
e
°
K
IP21, Top level
IP21, Middle level
IP21, Bottom level
Summary of Contents for 500 Series
Page 6: ... RQWHQWV ...
Page 32: ...26 Mounting methods and mounting details KDSWHU 7HUPLQDO GLPHQVLRQV DQG PRXQWLQJ DOWHUQDWLYHV ...
Page 46: ...40 Test switch modules for RED 521 KDSWHU 7HUPLQDOV ZLWK D WHVW VZLWFK PRGXOH ...
Page 72: ...66 Making the electrical connections KDSWHU OHFWULFDO FRQQHFWLRQV ...