background image

26

Arley Wood & Multifuel Stoves

INSTALLATION

CHECKLIST

Hearths, Fireplaces, Flues and chimneys

This checklist is to ensure hearths, fireplaces, flues and chimneys are satisfactory, and to show what you have done to comply with the 

requirements of The Building Regulations 2000 Approved Document J 2002. 

1.   Building address, where work has been carried out.......................................................................................................................................

.........................................................................................................................................................................................................................

2.  Identification of hearth, fireplace chimney or flue

3.  Firing capability: solid fuel/gas/.

4.  Intended type of appliance.

State model and output.

5.  Ventilation provisions for the appliance:

State type and area of permanently open vents.

6.  Chimney or flue construction

a)  State the type or make and whether new or existing.

b)  internal flue size (and equivalent height, where 

calculated - natural draught gas appliances only).

c)  If clay or concrete flue liners used confirm that they are

correctly jointed with socket end uppermost and 
state jointing materials used.

d)  If an existing chimney has been refurbished with a

new liner, type or make of liner fitted.

e)  Details of flue outlet terminal and diagram reference.

Outlet Details:

Complies with:

f)  Number and angle of bends.

g)  Provision for cleaning and recommended frequency.

7.  Hearth. Form of construction. New or existing?

8.  Inspection and testing after completion

Tests carried out by:
Tests and results

Flue

visual

inspection

sweeping

coring ball

smoke

Appliance (where included) spillage

I/we the undersigned confirm that the above details are correct. In my opinion, these works comply with the relevant requirements in
Part J of Schedule 1 to the Building regulations.

Print name and title....................................................................................................Profession..........................................................................

Capacity......................................................................................................................Telephone..........................................................................

Address............................................................................................................................................................Post code.......................................

Signed........................................................................................................Date.................................

Registered membership of..(e.g. CORGI, OFTEC, HETAS, NACE, NACS)............................................

Summary of Contents for Arley

Page 1: ...Arley Wood Multifuel Stoves Operating Installation Manual PLEASE RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE Arley 5 Flat Multifuel Stove Rev 1 June 2004...

Page 2: ...we are so confident in the reliability of our product that we offer a 3 year Warranty Should you have any questions about our Arley Stoves that are not covered in this manual please contact the Aarro...

Page 3: ...Firing 13 Ash Removal 13 SERVICING Cleaning Annual Maintenance 13 14 Accessories 15 INSTALLATION Page General Precautions 16 Handling 16 Hearth 16 Combustible Materials 16 Firebox Liner Panels 17 Thro...

Page 4: ...E BURNED IN THIS APPLIANCE TO USE THESE FUELS WILL INVALIDATE THE APPLIANCE GUARANTEE IF IN DOUBT CONTACT THE SOLID FUEL ASSOCIATION TELEPHONE NUMBER 0800 600 000 www solidfuel co uk THE USE OF SPARE...

Page 5: ...erly installed and operated a house fire may result installation must comply with the Building Regulations and conform to all relevant fire safety standards Arada Ltd produce a variety of appliances r...

Page 6: ...Hotplate 7 Operating tool 1 8 Rear liner 1 9 Side liners 2 10 Feet and fixings 4 N A Arley 7 Wood 2 1 1 5 1 2 2 4 Arley 7 Multifuel N A Arley 5 Wood 1 4 1 1 2 4 7 2 1 1 5 1 2 2 4 Arley 11 Wood N A 2...

Page 7: ...to Centre of Flue mm 105 Flue Diameter 102 4 Weight Packed Kg 50 1 7 Arley 7 Flat 8 4 8 2 2 510 486 365 399 121 127 5 56 Wood 59 MF Arley 7 Low 1 5 Arley 5 Wood 0 3 2 497 405 358 400 105 102 4 47 1 7...

Page 8: ...rovides over draught and The primary air inlet providing under draught to the base of the fire chamber through the controls on the doors of the fires PRIMARY AIR FOR ARLEY STOVES On the Arley primary...

Page 9: ...e hinges so that the below operations can be carried out on a workbench or similar level surface Fig 5 Fig 5 Removal of the Arley 5 door Unscrew the two nuts on the inside of the door securing the ret...

Page 10: ...bove steps Fig 9 Adjusting the Arley hinges FUEL RETAINER BARS Fuel retainer bars are supplied with the fire Slide and lift the bar until it is clear of the guides at each side and remove through the...

Page 11: ...reheat Blazebrite Taybrite Sunbrite Doubles Singles Anthracite Large Nuts and Welsh Dry Steam Coal Large Small Nuts Approval does not cover the use of other fuels either alone or mixed with the suitab...

Page 12: ...is well ventilated during this time EXTENDED BURNING The appliance will burn for an extended period provided Sufficient fuel is placed in the firebox The controls are set correctly Excess draught is...

Page 13: ...nd remove from the ash chamber WARNING The ash can be very hot Empty only to a metal container Even if the ash appears cold red hot pieces of ash may be concealed and could easily start a fire or caus...

Page 14: ...d shut down period DOOR GLASS The door glass should remain clear during normal daytimeburning Howeverundercertainconditions such as burning at a low rate with damp wood or overnight burning the glass...

Page 15: ...l in your Arley wood stove See Fig 10b ADD IN BOILERS See page 24 for further instructions on add in boilers PAINT Matching aerosol paint to tone in any connecting flues pipes or surrounding metalwork...

Page 16: ...HEARTH The fire should be installed to stand on a constructional hearth of non combustible materials not less than 125mm 5 thick conforming to Building Regulations Dimensions of the hearth should pro...

Page 17: ...side liners The long centre tab on the back edge rests on the rear liners The shorter turn down tabs against the vertical face Replace the front fuel retainer bars or multifuel grate Note Neither the...

Page 18: ...ng end marked L onto the low section of the comb The upper bar is fitted in a similar manner but with the end marked L inserted in the rear channel and the end marked H seated on the high section of t...

Page 19: ...tallation and are interchangeable These are fitted as follows To fit the interchangeable canopy Fig 10c Remove the front clamps Tilt the canopy as shown in stage 1 Engage the rear clips and pull fully...

Page 20: ...umes from the stove outlet to the outside air To ensure a good updraught it is important that the flue gases are kept warm and that the flue size suits the stove The termination of the outlet at the t...

Page 21: ...ocument J of the Building Regulations for England and Wales is available from The Stationery Bookshops and can also be viewed at the ODPM website at www safety odpm gov uk bregs brads htm Details on t...

Page 22: ...22 Arley Wood Multifuel Stoves INSTALLATION...

Page 23: ...ATED FLUES TYPICAL METAL INSULATED CHIMNEY SYSTEM TO BE INSTALLED TO THE CHIMNEY MANUFACTURERS INSTRUCTIONS IN COMPLIANCE WITH BUILDING REGULATIONS AND BS7566 PTS 1 4 A is minimum clearance for non in...

Page 24: ...and calculations for individual heating systems should be carried out by a qualified heating engineer In many cases your supplier will be able to offer advice and assistance Direct Systems Stainless s...

Page 25: ...e from the expansion tank should be 28mm diameter copper Pipes in unheated spaces must be lagged FINAL CHECK Before handing over the installation to the customer it is strongly recommended that the ap...

Page 26: ...appliances only c If clay or concrete flue liners used confirm that they are correctly jointed with socket end uppermost and state jointing materials used d If an existing chimney has been refurbished...

Page 27: ...S009A AFS009A AFS010 2 Throat Plate 3 Grate Bar Set 4 Hot Plate 5 Operating Tool 6 Ashpan 7 Flue Spigot Part Description Visual Aid not to scale Arley 5 Wood Arley 5 Multifuel Arley 7 Wood AFS1012 AFS...

Page 28: ...it Complete with Gasket 12 Glass Clips 13 Hinge kit Comprises 2 Hinges 4 Fixings Per Set 14 Airwash Curved Part Description Visual Aid not to scale Arley 5 Wood Arley 5 Multifuel Arley 7 Wood AFS1156...

Page 29: ...Assembly Complete with Handle Glass Gaskets Clips and Seal 19 Fire Door Locking Assembly 21 Aarrow Fires Gauntlet Gloves 22 Wood Burning Tray 23 Multifuel Upgrade Kit Part Description Visual Aid not...

Page 30: ...eer The Manufacturers decision shall be final If your appliance proves to be defective as a result of faulty materials or workmanship during guarantee we will repair or replace it FREE OF CHARGE as lo...

Page 31: ...is manual please contact your Aarrow retailer Please keep all repair receipts safely Please ensure you have this manual available when an engineer visits as they will complete the service record chart...

Page 32: ...l No I ve checked it and it s O K Assembled by Checked by Date of Purchase Name and address of supplier Please ensure installer completes INSTALLATION CHECK LIST details on page 26 of this manual If a...

Reviews: